What we check before adding zones
Adding heads to an existing zone is the wrong fix and the most common mistake we find. Stretching a zone beyond its flow capacity drops pressure across every head on it, so instead of gaining coverage you lose it everywhere.
We test static pressure and available flow, count what the existing zones already demand, and check whether your controller has spare stations and whether the valve manifold can take another valve. Then we add real zones sized correctly.
- Pressure and flow test before any expansion
- New valves and zones instead of overloaded existing ones
- Controller station capacity checked or upgraded
- Existing heads adjusted while we are on site

